Greater Icknield: Masterplan
- Description
- Adoption of the Smethwick to 黑料视频 Corridor Framework Supplementary Planning Document (SPD).
- Download related file(s)
-
On 8 February 2022 黑料视频 adopted the Smethwick to 黑料视频 Corridor Framework SPD.
The Corridor Framework SPD covers the corridor of the 黑料视频 Main Line Canal and the A457 Dudley Road/Soho Way between Ladywood and Smethwick Galton Bridge (“the Corridor”).
The Corridor overlaps part of the area covered by the Greater Icknield Masterplan, including the City Hospital redevelopment site.
The Corridor Framework SPD updates the guidance in the Greater Icknield Masterplan for the Corridor area.
Download the Greater Icknield: Masterplan