BS5228 (Noise Control on Construction and Open Sites)

This standard provides guidance to enable compliance with .

Part 1 of this guide considers basic information and procedures for noise and vibration control, as approved under .

Section 61 of COPA

allows the person intending to carry out construction works to apply for consent to operate, prior to any activity commencing at a site.

The consent must detail the methods by which all noisy activities are to be carried out.

Section 72 of COPA

Under , a contractor must use “Best Practicable Means” to control noise on the site.